BACKGROUND
EnergyPro were engaged to take over as technical managers for a 12- turbine site. Upon the initial site inspection, it was identified that SF6 labelling was absent from most of the substation and turbine switchgear
Â
ENERGYPRO ACTIONS
This was flagged as a takeover action. EnergyPro procured signage and arranged for the OEM and HV contractor to apply it at the next site visit.
Â
RESULTS
This site is now fully compliant with SF6 regulations regarding labelling and identification of greenhouse gases.